To get electrical panel quotes in Montreal and nearby, tell us the current amperage (60, 100 or 200 A), the panel type (fuses or breakers), the project (heat pump, EV charger, addition) and your city. We send your request to up to 4 electricians in your area. Free, no obligation.
An old fuse panel or a 60 A service is no longer enough for a heat pump, an EV charger and modern appliances. Many insurers also ask for it to be replaced. A service upgrade is coordinated with Hydro-Québec.
Work covered
- Fuse panel replacement
- Service upgrade (100 A or 200 A)
- New breakers and circuits
- Sub-panel for garage or basement
- Grounding and surge protection
- Disconnection coordination with Hydro-Québec
What affects the price?
- Target amperage
- Mast and exterior service entrance
- Number of circuits to redo
- Permits and inspection
How it works
- Describe your project: type of work, size, timeline, city.
- We contact companies: up to 4 qualified companies in your area.
- Compare and choose: prices, timelines, warranties. No obligation.
Choosing a contractor
- RBQ licence: required for most construction and renovation work in Quebec. Check it in the Régie du bâtiment du Québec registry.
- Liability insurance: ask for valid proof.
- Detailed written quote: materials, labour, schedule, warranties.
- Municipal permit: many projects need one. Check with your city before starting.
- Reasonable deposit: never pay the full amount before work begins.
Areas served
We send requests to companies in Montreal and nearby: Montreal, Laval, Longueuil and the South Shore, Brossard, the North Shore, Terrebonne, Repentigny, Blainville, the West Island, Vaudreuil-Dorion and Châteauguay.
Is the service free?
Yes, requesting quotes is free and comes with no obligation.
Estimations.pro is a matching service and does not perform the work. Requirements (RBQ licence, permits, municipal bylaws) can change: check with the relevant authorities.
Frequently asked questions
How long does a panel replacement take?
Often one day, with a power outage of a few hours. Timing also depends on Hydro-Québec’s availability for disconnection.
100 A or 200 A?
With a heat pump, an EV charger or full electric heating, 200 A is often recommended. The electrician does a load calculation.